Home About Us Services Projects Contact


click photo for more pictures
American Legion Post 333

Sun Prairie, WI (2004)
$1.1M,10,200 GSF new building including a bar, 2 banquet rooms (250 person total), kitchen, museum and support facilities. The design reflects the historical context of the downtown Sun Prairie business district.


click photo for more pictures
Clinton County Courthouse
Clinton, IA (2003)
Remodeling and restoration of a 35,000 GSF three-story historic courthouse built in 1893. The remodeling included new offices for the County Attorney, Clerk of Courts, Emergency Government and three Judge’s Chambers; two new and one restored courtrooms; addition of a 640 GSF Entrance Vestibule; window replacement on the entire building; and other miscellaneous modifications. The $5.5M project was coordinated over three years by a Contract Project Manager and constructed by the County.


click photo for more pictures
Dental Health Associates, East Side Facility
49 North Walbridge
Madison, WI (2003)
$1.25M, 3,100 GSF addition to an 11,700 GSF existing dental clinic. Addition and remodeling includes total redo of the entrance and waiting areas, addition of orthodontic spaces, Doctors’ Lounge, new record storage area, expanded lunch-room, new conference room and miscellaneous remodeling of remaining dental spaces.


click photo for more pictures
Dental Health Associates, West Side Facility
Old Sauk & Gammon
Madison, WI (2005)
$3.4M, 17,400 GSF addition to recently purchased 4,300 GSF office building. Entire facility to be converted to dental clinic spaces including general dentistry and orthodontia. The two-story addition reflects the architecture of the original building.


click photo for more pictures
5 & Diner Restaurants

Sun Prairie, WI (2005) and Worcester, MA (2006)
Project architect for franchise developed 50's style diners (3,321 SF). Provided architectural and coordinated structural engineering adaption of corporate design (designed in Phoenix, AZ) to comply with WI codes and weather conditions. MEP was completed via a design-build approach. Provided architectural and coordinated SMEP engineering for similar but slightly larger (3,857 SF) adaption of corporate design to comply with MA codes and weather conditions.


click photo for more pictures
Park Tower
Clinton, IA (1980)
Four story elderly low-income housing (HUD). Architect provided design and construction documents while employed
 in previous firm.


O N E  P L U S  I N C  6 0 8 - 8 3 7 - 8 0 2 2
1 1 3  W e s t  M a i n  S t r e e t ,  S u n  P r a i r i e ,  W I  5 3 5 9 0